%@LANGUAGE="VBSCRIPT" CODEPAGE="1252"%>
| Integral Bridges Task Group Introduction |
|
|
The CBDG has set up a Task Group to develop guidance on the design and construction of Integral Bridges. Its aim is to produce best practice guidance sheets on key aspects to clarify some of the current issues concerning this form of construction. Initially the Task Group is putting particular emphasis on the geotechnical aspects of Integral Bridges, although the study will not be limited to this and other issues will be addressed over time. TRL have been commissioned in 2004 to undertake a research programme for the Task Group which entails the installation of computer loggers at three different sites to monitor the changes in lateral earth pressure with deck temperature over a year The Task Group has brought together experts from across the industry. As well as the members on the Task Group, other leading bridge and geotechnical engineers will contribute to the activities and assist in developing the guidance sheets. The members of the Task Group are:
|
![]() |
|
The scope and issues to be considered include the following:
|
![]() |
|
The committee is currently awaiting relevant information on the implementation of Eurocode EN1992-2 before proceeding further. |
|
Riverside House, 4 Meadows Business Park, Station Approach, Blackwater, Camberley, Surrey, GU17 9AB Tel:01276 33777 Fax: 01276 38899 E-Mail: enquiries@cbdg.org.uk |
|